
Emirates Biotech, UAE announces that it has selected SAMSUNG E&A as the contractor for its upcoming Polylactic Acid (PLA) production plant in the United Arab Emirates.
The strategic project, officially named Falcon PLA Project , will deliver a cutting-edge facility producing a biodegradable and environmentally friendly plastic alternative and solidifies Emirates Biotech’s commitment to environmental responsibility and innovation.
With an unrivalled track record of bringing these innovative but complex industrial projects to fruition, SAMSUNG E&A has been selected as the sole partner for this project. In that role, SAMSUNG E&A will oversee all engineering, procurement, and construction work for the Falcon PLA project, ensuring that it progresses smoothly and aligns with the planned schedule and budget. The pre-EPC contract, covering the initial phase of the collaboration, was signed on 14 April 2025 at Emirates Biotech’s head office in the UAE.
Emirates Biotech recently selected Sulzer as the technology provider for its PLA plant and SAMSUNG E&A will ensure the Sulzer technology and proprietary equipment will be integrated flawlessly into the PLA production facility.
The plant, expected to be operational in early 2028, will be located in the KEZAD free zone in Abu Dhabi, a new industrial area with access to state-of-the-art transportation infrastructure including the deep sea port of Khalifa.
Emirates Biotech aims to accelerate the transition from fossil-based plastics to renewable, biodegradable alternatives, ensuring industries worldwide have access to high-performance, environmentally responsible solutions.