Saudi Arabia Announces Qualified Developers for Round 6 Renewable Energy Projects

The Saudi Power Procurement Company (SPPC) has announces the Qualified Developers for the sixth round of renewable energy projects under the National Renewable Energy Program (NREP) which is led and supervised by the Ministry of Energy.

The combined capacity of Round 6 projects is approximately 4,500 MW.

List of Qualified Bidders for Round 6 Solar PV IPP Projects:

  1. Abu Dhabi Future Energy Company PJSC – Masdar, JERA NEX Limited
  2. Alfanar Company CJSC, Power Construction Corporation of China (POWERCHINA)
  3. EDF Renouvelables S.A., China Power Engineering Consulting Group International Engineering Co., Ltd
  4. Kahrabel FZE (Ultimate Parent Company – ENGIE S.A), POSCO INTERNATIONAL CORPORATON
  5. FAS ENERGY KSA LLC, Saudi Electricity Company
  6. Jinko Power (HK) Company Limited
  7. Korea Electric Power Corporation (KEPCO)
  8. Marubeni Corporation
  9. Nesma Renewable Energy
  10. SPIC Huanghe Hydropower Development Co., Ltd.
  11. Sumitomo Corporation
  12. TOTALENERGIES RENEWABLES SAS
  13. Al Jomaih Energy & Water Co. Ltd.
  14. Sembcorp Utilities Pte Ltd
  15. Al Gihaz Holding Company
  16. Korea Western Power Co., Ltd,

     

List of Qualified Bidders for Round 6 wind PV IPP Projects:

  1. Abu Dhabi Future Energy Company – PJSC – Masdar, Al Jomaih Energy & Water Co. Ltd., Nesma Renewable Energy
  2. EDF Renouvelables S.A., Jinko Power (HK) Company Limited
  3. Kahrabel FZE (Ultimate Parent Company – ENGIE S.A), Saudi Electricity Company
  4. Marubeni Corporation, China Power Engineering Consulting Group International Engineering Co., Ltd
  5. Sembcorp Utilities Pte Ltd, POSCO INTERNATIONAL CORPORATON
  6. Sumitomo Corporation, Korea Electric Power Corporation (KEPCO)
  7. TOTALENERGIES RENEWABLES SAS, NAREVA HOLDING
  8. Marubeni Corporation, JERA NEX Limited
  9. Goldwind Science & Technology Co.,Ltd
  10. Power Construction Corporation of China (POWERCHINA)
  11. Alfanar Company CJSC
  12. SPIC Huanghe Hydropower Development Co., Ltd.
  13. Al Jomaih Energy & Water Co. Ltd.
  14. Sembcorp Utilities Pte Ltd
  15. Al Gihaz Holding Company
  16. Korea Western Power Co., Ltd,

The projects are as follows:

  1. The [1500] MWac Dawadmi Wind IPP to be located in the Central province, KSA.
  2. The [1400] MWac Najran Solar IPP to be located in the Southern province, KSA.
  3. The [600] MWac Samtah Solar PV IPP to be located in Central province, KSA.
  4. The [600] MWac Darab Solar PV IPP to be located in the Southern Province, KSA.
  5. The [400] MWac Sufun Solar PV IPP to be located in the Central Province, KSA.

These projects are part of NREP, which aims to achieve the optimal energy mix, displacing liquid fuels in the Kingdom’s power sector and supply 50% of its electricity from renewable energy by 2030.

SPPC is responsible for the predevelopment, tendering, and subsequently offtaking the Energy from the projects.

Read Also: Saudi Arabia issues RFQ for Round 6 Renewable Energy Projects with Total Capacity 4,500 MW