Dubai’s Roads and Transport Authority (RTA) announced in a statement that it has awarded a contract for the Improvement of Umm Suqeim Street Project.
This project, which extends from the intersection with Al Khail Road to the intersection with Sheikh Mohammed bin Zayed Road, costs AED332 million.
The Improvement of Umm Suqeim Street Project is a 4.6 km long project that extends from Al Khail Road to Sheikh Mohammed bin Zayed Road. The project includes an upgrade of the intersection with Al Barsha South Street, located near Kings School, by constructing an 800-metre-long tunnel with four lanes in each direction on Umm Suqeim Street. A signalised surface intersection will also be constructed as a part of the project.
RTA completed the initial phase of the Improvement of Umm Suqeim Street Project in 2013. This phase covered the sector between Sheikh Zayed Road and Al Khail Road. It saw the construction of two 3-lane bridges. The first spans the eastern street parallel to Al Asayel Street, and the second crosses the western street parallel to the First Al Khail Road. It also included the construction of two signalised intersections at the junctures with Al Asayel Street and First Al Khail Road. Furthermore, three pedestrian bridges were constructed over Umm Suqeim Street to enhance pedestrian access between the Al Quoz and Al Barsha.
In 2020, RTA opened a central 500-metre bridge as part of the Bridges and Roads leading to Dubai Hills Mall Project. The bridge is located at the intersection of Umm Suqeim Street and the entrances of Dubai Hills and Al Barsha areas. It consists of four lanes in each direction and is capable of handling up to 16,000 vehicles per hour.