Abu Dhabi Future Energy Company PJSC – Masdar, the UAE’s clean energy powerhouse, has signed a joint development agreement with the Jordanian Ministry of Energy and Mineral Resources to develop a 1 gigawatt (GW) wind project with a battery energy storage system (BESS), and a memorandum to explore the feasibility of establishing a green hydrogen plant.
The agreements with the Ministry were signed at COP28 by Masdar Chief Executive Officer, Mohamed Jameel Al Ramahi and the Jordanian Minister of Energy and Mineral Resources, His Excellency Dr Saleh Al-Kharabsheh. The signing ceremony was witnessed by UAE Minister of Industry and Advanced Technology, COP28 President and Masdar Chairman, HE Dr Sultan Al Jaber and the Minister of the Environment for Jordan, H.E.Dr Muawieh Khalid Radaideh.
The study will examine the feasibility of establishing a green hydrogen project near The Port of Aqaba to produce the most cost-competitive hydrogen, utilizing desalinated seawater, and dedicated renewable power.
Masdar already has a presence in Jordan through its Baynouna Solar Energy Company (BSCE) joint venture with Finnish investment and asset management group Taaleri, which inaugurated the 200MW Baynouna Solar Park, the largest clean energy project in Jordan, in February of this year.
Masdar is pursuing a target of 1 million tonnes of green hydrogen production by 2030 as part of the UAE’s plans to establish itself as a green hydrogen hub and capture 25 per cent of the global low-carbon hydrogen market by 2030.