Saudi Electricity Company (SEC) invites the bids for the project, Construction of Jafurah 380/230kV Substation. The Project location is in eastern region of Saudi Arabia.
Project scope of work includes construction of new indoor 380/230kV Gas Insulated Substation (GIS) with major equipment of 380kV GIS, 230kV GIS, 752MVA Power Transformers, Reactors, Protection & Control System, Substation Automation System, Telecommunication System, Security System, Cyber Security, Civil works and Electro-mechanical works.
The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of substation work in a satisfactorily working and operating condition.
Project completion period is 29 months.
At present, bid submission date is 10 January 2022.
The Jafurash gas field is the largest natural gas field in the Kingdom, stretching 170 km by 100 km, is estimated at 200 trillion cubic feet of rich raw gas.
Read Also: Samsung Engineering Signed Jafurah Gas Treatment Package 1 project