Roads and Transport Authority (RTA), Dubai has released a tender for constructing three integrated truck rest stops in Dubai. The project offers an innovative model of Public-Private Partnership (PPP).
These rest stops will be situated in vital spots. The first is on Sheikh Mohammed bin Zayed Road nearby Jebel Ali Industrial Area 3 in the direction of Abu Dhabi. The second is on Emirates Road, near the entry of Sharjah. The third is in Dubai Industrial City nearby Sheikh Mohammed bin Zayed Road.
Explaining the project features, His Excellency Mattar Mohammed Al Tayer, Director-General, Chairman of the Board of Executive Directors of the Roads and Transport Authority, said: “The project will be undertaken in partnership with the private sector based on Build-Operate-Transfer (BOT) model in a contract that runs 25 to 30 years.
Through this project, RTA offers private entrepreneurs a long-term investment opportunity to add innovative and smart services and diversify their sources of income, which serves the key objectives of the PPP. Local and global firms are invited to tender their financial and technical proposals.”
“The first site, which is near Jebel Ali Industrial Area 3 in the direction of Abu Dhabi covers an area of 100 thousand square metres and accommodates 170 to 200 trucks.
The second site adjacent to Emirates Road and Sharjah entry point, spans 70 thousand square metres and will accommodate 130-150 trucks.
The third site is planned at Dubai Industrial City nearby the Sheikh Mohammed bin Zayed Road over an area of 50 thousand square metres with a capacity to take 90-100 trucks.
The three rest-stops will have integrated services that meet all the basic and daily needs of heavy vehicle drivers such as specialist technical testing centres, truck service centres, warehouses, restaurants, outlets and rest areas,” continued RTA Director-General, Chairman of the Board of Executive Directors.
Interested bidders can get complete bid documents upon the payment of tender fee of AED 1500.
Bidders need to submit a tender security of AED 207,000 along with the proposals valid for 120 days.
At present, bid submission date is 08 Sep 2021.
Read Also: RTA Dubai awards contract to improve 11 km Saih Al Dahal Road