Saudi Electricity Company (SEC) invites the bid for construction of New Diriyah Gate 380/132/13.8kV Substation (9082). The Project location is in Riyadh.
- 380kV Gas Insulated Switchgear (GIS)
- 380kV Hybrid GIS
- 132kV GIS
- 13.8kV Switchgear
- 302/402/502MVA, 380/132/13.8kV power transformers
- 50/67MVA,132/13.8kV power transformers
- 2.5MVA, 13.8kV/400V-230V Station Service Transformers
- 380kV Reactors
- 132kV Reactors
- Power Cables and Terminations
- AC/DC Auxiliary Power Supply
- Surge Arresters
- Control/Protection System,
- Substation Automation System (SAS)
- Communication System
- Fire Detection/Alarm and Safety and Fire Protection System
- Civil/Structural works and Mechanical works
- HCIS Security System
Project Scope of Work also includes 380kV GIS expansion at 9005 BSP along with all other required material.
The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of new substation work in a satisfactorily working and operating condition.
Contractor needs to achieve the final acceptance of the works by 25 months from Contract Signing Date.
Present, Bid Submission date is 06 May 2021.
In another tender, SEC invites bidders proposals for the 380kV Cables for interconnecting above new substation with the network.
Present, Bid Submission date for Cable tender is 03 May 2021.
***
For latest updates, follow us on LinkedIn, Facebook, Twitter,
For email notifications, please subscribe us