The Red Sea Development Company (TRSDC), the developer behind the world’s most ambitious regenerative tourism project, announced in a statement that it has awarded contracts to Saudi company Al Bawani and Swiss firm Blumer Lehmann to support the development plans and structural work of its luxury hotels and resorts.
The two companies will play pivotal roles in the construction of hotels across The Red Sea Project, with Al Bawani responsible for civil and structural works across 40 hotel villas on the Southern Dunes site, and Blumer Lehmann responsible for timber construction planning and fabrication as well as supply works for a hotel situated on Ummahat Al Shaykh Island.
Contract With Al Bawani:
Al Bawani has been awarded the first contract for the Southern Dunes site, which involves civil and structural works for 40 hotel villas as well as utility works and site-wide roads. The roads are an integral part of development plans for the project as they will interlink the hotel villas, restaurant and central hotel buildings.
The Saudi-based company will also be responsible for the earthworks and stabilization of each of the villas, along with their structures and underground utilities connections – an essential part of the development plans.
Al Bawani’s scope also includes the construction of the infrastructure networks for the Southern Dunes resort, such as sewage, potable water, telecommunications and landscape lighting.
As part of the contract, Al Bawani will establish staff accommodation on site near the Southern Dunes development. This will eventually house 700 employees and will include a host of high-quality amenities. The close proximity of the housing to the site will substantially reduce workers’ travel time and help improve productivity.
Contract With Blumer Lehmann:
TRSDC has also appointed leading Swiss timber construction company Blumer Lehmann for the timber construction planning and fabrication as well as supply works for a resort designed by Kengo Kuma and located on Ummahat Al Shaykh Island.
This award involves the design, off-site manufacturing in Switzerland, and supply of all engineered timber material for the entire hotel, overwater and beach villas, spa and fitness building, restaurants, and the arrival building.
During the installation stage, Blumer Lehmann will provide the technical support and supervision needed for smooth installation on-site.
***
Read Also: UAE’s Killa Design secured Red Sea Project villas design contracts
For latest updates, follow us on LinkedIn, Facebook, Twitter,
Greetings
As per your advertisement on the website Saudi gulf project. Please give us chance to Introduction Bader Ibrahim Al-Hajri Company (BIHCO).
We will be looking forward to hear from you and to explore business association with your esteemed organization.
Should you need any further information, kindly do not hesitate to contact us.
Mohammed Basheeruddin (Executive Manager)
Mobile Number 0504804205
Abdul Rahman (Project Manager)
Mobile Number 0551315259
Best Regards