Ministry of Electricity & Water (MEW), Kuwait received the bidders proposals for the following new Substations :
- Construction of SHPT”C” 132/11 kV Substation
- Construction of SHPT”D” 132/11 kV Substation
- Construction of SHPT”E” 132/11 kV Substation
- Construction of SHPT”F” 132/11 kV Substation
The tender was issued by MEW, during January 2020 (read more)
132/11kV Substations in Kuwait:
Each of the Project involves the construction of a new indoor 132/11 kV Gas Insulated Substation, arranged in single bus single breaker configuration.
Each of the Substation consist of following major equipment:
- 132kV Gas Insulated Switchgear (GIS)
- 11kV Switchgear
- 30MVA, 132/11kV power transformers
- 5 MVA 33/11kV Power Transformers
- Neutral Earthing Resistors
- 250kVA, 11kV/433V Station Service Transformers
- MV Power Cables and Terminations
- AC/DC Auxiliary Power Supply
- Control/Protection System
- Substation Monitoring System
- Communication System
- Fire Detection/Alarm and Safety and Fire Protection System
- Civil/Structural works and Mechanical works
The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of new substation and cable works in a satisfactorily working and operating condition.
Contractor need to complete the project activities with in 24 months from the date of Contract award.
***