Saudi Arabia’s Al Widyan Saudi Real Estate Company (Al Widyan Co.), issued the tender for construction 132/13.8kV Substation and 380kV Underground Cable Project.
The project location is in Riyadh, Central region of Saudi Arabia.
Project scope of works includes the construction of new indoor 132/13.8kV Substation. Major equipment includes, 132kV GIS, 67MVA Power Transformers, Protection and Substation Automation System, Telecommunication System, Civil works and Electro-mechanical works.
Associated 380kV Underground cables and 132kV Cables between the new substations are part of the project.
The Contractor shall perform on Lump sum turnkey basis, the design, engineering, materials procurement, quality management, factory inspection/testing, transport and delivery to site, installation, construction, site inspection, testing and commissioning, all associated work and services until final handing over of substation work in a satisfactorily working and operating condition.
Project completion period is 18 months. At present bid submission date is 30 August 2020.
During 2018, Al Widyan awarded SAR 1.1 billion infrastructure contract to Saudi based construction firm, BINYAH for the development of 7 million Sq.m northern growth corridor of Riyadh.
***