Dubai’s Target Engineering Construction Company, a subsidiary of Arabtec Holding, announced in a statement that, it has been awarded an EPC Contract for Upgrade of Produced Water Disposal Facility by Saudi Aramco.
The project location is in Qatif area, eastern region of Kingdom of Saudi Arabia.
The value of signed contract is SAR 280 million (1$=3.75 SAR).
Project Description:
As per the project’s Scope of Work, Target will be in charge of upgrading and developing a produced water disposal facility at Qatif’s gas-oil separation plant (GOSP-1).
Target will work on the installation of a water-oil separation vessel, water disposal pumps, water injection pumps, low-pressure de-gassing tank water draw-off pumps, and a pipeline to transfer oily water from Ju’aymah Terminal to Qatif’s GOSP-1.
I must thank you for the efforts you’ve put in writing this website.
I’m hoping to check out the same high-grade content from you in the future as well.
In truth, your creative writing abilities has inspired
me to get my very own site now 😉