Project Description:
Project Scope of work includes Installation of four (4) numbers 380kV Line Shunt Reactors with the required 380kV Hybrid Gas Insulated Switchgear (HGIS), Neutral Grounding Reactors, Surge arresters, etc., two (2) each at existing Waad Al-Shamaal 380kV BSP & ARAR BSP including complete protection, metering, control, communication and modification. The new items installed shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the Power Control Center (PCC) through SCADA system, communication System and gateway. The monitoring Control and Protection system shall be IEC 61850 Standard based on Substation Automation System.
Note: For complete scope of work or all the bidders prices, please do contact us.